Biomass Case Study:
Buchan Braes Hotel

 

 

Installation Date: February 2015
Location: Boddam, Near Peterhead
System Size: 2 x 99kW Froling P4 Boilers

 

This project comprised of a Biomass 198kw pellet installation with a 14 tonne pellet store for Buchan Braes Hotel in Boddam near Peterhead.

There are 2 x 99kw Froling P4 boilers on a cascade system.  All heating and hot water which the hotel now generates comes from the installation of these 2 Biomass boilers, The hotel has a restaurant, bar area, Ballroom / conference room and 47 bedrooms all of which are now heated using their Biomass system.

Not only will The Buchan Braes see a return on their investment in 4 years, but they will also reduce their carbon footprint,saving 1,722 Tonnes of CO2 over the next 20 years, the equivalent of flying from London to Sydney 559 times!

Buchan Braes Hotel Biomass

 

 